MWP Mark II – 3 main stages

To meeet the operational goals, the process is as follows:

  • Natural Frequency
    • The MWP Mark II is arranged and sized to meet the goals of natural frequency, in particular avoidance of the wind turbine 1P and 3P frequency bands.
  • Strength
    • The MWP Mark II must meet the site maximum environmental criteria (wind, wave and current) within tolerances for allowable stress and deflection.
  • Fatigue
    • Key connections must meet the fatigue life goal of 25 years for the project wind and wave fatigue load criteria.